Container M/V CONTSHIP ZOE -
Abt 13,758 Dwt on 8.5m Draft
Built 2007 at Yangzhou Dayang Shipbuilding Co Ltd, China
Ice class 1D, Class RI, SS 06/2027, DD 11/2025
LOA 147.78m / LBP 140.3m / Beam 23.25m / Depth 11.5m
GT/NT 9,948/5,020
5/- Ho/Ha, 16,000/16,000 cbm Grain/Bale
1,114 TEU, 220 reefer plugs
688 TEU at 14 ts
Gear 2 x 45 ts
M/Eng. MAN - 7L58/64 9,733 kw at 428 rpm
Abt 19.6 kn on 38.5 ts IFO
Aux.Eng. 3 MAN B&W 610 kw
Shaftgen. 1 x 1,400 kw, gen.set 3 x 570 kw
Bowthruster 1 x 700 kw
Heavy Cargo str.
- ON T/C TO COSCO AT USD 15,250 PD, LESS 2.5 PCT TOTAL COMM, WITH MINIMUM RE-DELIVERY DATE ON 14 MAY 2026 - MAXIMUM RE-DELIVERY DATE 14 JULY 2026 CURRENTLY TRADING CARIBS.
Abt 13,758 Dwt on 8.5m Draft
Built 2007 at Yangzhou Dayang Shipbuilding Co Ltd, China
Ice class 1D, Class RI, SS 06/2027, DD 11/2025
LOA 147.78m / LBP 140.3m / Beam 23.25m / Depth 11.5m
GT/NT 9,948/5,020
5/- Ho/Ha, 16,000/16,000 cbm Grain/Bale
1,114 TEU, 220 reefer plugs
688 TEU at 14 ts
Gear 2 x 45 ts
M/Eng. MAN - 7L58/64 9,733 kw at 428 rpm
Abt 19.6 kn on 38.5 ts IFO
Aux.Eng. 3 MAN B&W 610 kw
Shaftgen. 1 x 1,400 kw, gen.set 3 x 570 kw
Bowthruster 1 x 700 kw
Heavy Cargo str.
- ON T/C TO COSCO AT USD 15,250 PD, LESS 2.5 PCT TOTAL COMM, WITH MINIMUM RE-DELIVERY DATE ON 14 MAY 2026 - MAXIMUM RE-DELIVERY DATE 14 JULY 2026 CURRENTLY TRADING CARIBS.